Home Archive News Contact
More Filters

This paper examines the impact of improving working conditions and increasing capacity with Dual track system. Three different cases were examined: Power ratio 100-650 kW, 200-550 kW and 300-350 kW. All three different cases were obtained in very similar conditions (time necessary for chemical analysis, alloying processes, slag cleaning e...

By Šehzudin Dervišić, Sedad Mušinović, Ajla Huseljić

21.04.2016. Professional paper Metallic materials
THE UTILIZATION WASTE HEAT OF FLUE GAS IN A HOT DIP GALVANIZING PROCESS

In this paper will be presented a practical example of the fuel savings in the process of hot-dip galvanizing. Reconstruction of the line is carried out during the transition of equipment from one to another location. Total power of the melting furnace it was 2.4 MW, and hot air generator for drying oven, has a power of 600 kW. With ...

By Jusuf Duraković, Sedad Mušinović, Nermin Hero

24.04.2014. Professional paper Environment protection and sustainable development
ANALYSIS AND RATIONALIZATION OF ENERGY CONSUMPTION IN GRAY IRON FOUNDRY

This paper describes the analysis and rationalization of energy consumption in gray iron foundry CIMOS TMD Casting Zenica. Based on results of analysis the key points are defined rationalized and measures proposed to reduce energy consumption, and therefore reduce production costs. The most significant share of energy consumption, and therefore in ...

By Sedad Mušinović, Hasan Avdušinović, Šehzudin Dervišević

Conference of University of Zenica